







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What full kitchen remodeling in Tustin, CA actually involves
Full kitchen remodeling in Tustin gutting a kitchen down to the studs and rebuilding it: cabinets, counters, sink and faucet, backsplash, flooring, appliances, lighting, outlets, and usually paint and trim. You should plan on having the kitchen out of service for 6 to 10 weeks, and the all-in price for this work in Tustin runs from $14,000 to $45,000 depending on size, condition, and how far you move plumbing and wiring. Call (833) 954-6066 for a free on-site estimate, and our team can give you a real number instead of a phone guess.
How we run a full kitchen remodel, stage by stage

Most homeowners don’t realize how much of a kitchen remodel is decisions and inspections, not sawdust. Here’s the sequence we follow, so you can see where you need to be involved at each point.
Stage 1: Assessment and layout (week 1 – 2)
We start by opening up what’s hidden: checking the subfloor, tracing the supply and drain lines, and mapping the electrical panel’s capacity. In Tustin’s older homes, that step often surfaces problems that weren’t visible before demo. This is also where you finalize the layout, cabinet box sizes, and appliance model numbers. Decisions due: cabinet line, appliance list, and whether the sink stays in place or moves.
Stage 2: Permits and demo (week 2 – 3)
Once drawings are ready, we pull the permit through the city and then demo the room down to framing. That means pulling cabinets, counters, flooring, and any old drywall that hides wiring or plumbing. We protect the rest of the house with plastic and floor runners. Decisions due: anything you’re donating or saving before demo day, and the final schedule with the trades.
Stage 3: Rough-in and rough inspections (week 3 – 4)
Plumbing, electrical, and any structural changes happen in this window, then the city inspection follows. If we’re moving a wall or adding a window, this is when it gets framed and signed off. Homes in Old Town Tustin often need the wiring brought to current code while the walls are open, which is cheaper now than after the drywall goes back up.
Stage 4: Drywall, cabinetry, and finishes (weeks 4 – 7)
Insulation and drywall go up, then the cabinets, countertop template, tile, flooring, and trim. Countertop fabrication alone usually takes 7 to 14 days from template to install. Decisions due: paint color, grout and tile selections, slab or quartz choice, and hardware finish.
Stage 5: Punch list and walkthrough (week 7 – 10)
We set appliances, hang doors, test every outlet, and run a full punch list with you in person. Anything that needs adjusting gets handled before we call it done. If something turns up after the final walkthrough, the 730-Day Done Right Promise covers it in writing, which is one of the longest workmanship guarantees in residential construction.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that shape your kitchen (and what each one costs you)
A full kitchen remodel is a stack of decisions. Here’s how we walk homeowners through the big ones, and where the honest trade-offs sit.
- Cabinet boxes and doors: KraftMaid and similar lines offer plywood-box construction with a range of door styles. Particleboard boxes save money up front but don’t survive moisture the way plywood does. This is the single biggest lever on price.
- Countertops: Quartz is dense and non-porous, which suits Tustin’s dry climate and daily traffic; Cambria is a common pick. Granite needs sealing. Laminate is the budget answer and has improved, but don’t expect long-term durability around the sink.
- Flooring: Porcelain tile handles water and heat well and stays cool; luxury vinyl plank is warmer underfoot and cheaper, but it can telegraph dents from heavy appliances. Nothing wrong with either as long as you pick for how you actually live.
- Layout changes: Moving the sink means rerouting drain lines, which can add to the plumbing line item quickly. Moving a gas range calls for a gas line change and inspection. Relocating a window or wall is where a remodel becomes a structural project.
- Appliances: Standard-width appliances simplify cabinet sizing. Slide-in ranges and pro-style hoods cost more but usually look better and vent more effectively.
What full kitchen remodeling costs in Tustin, CA

Plan for $14,000 to $45,000 for a full gut remodel in Tustin. The number moves mostly on five variables: the room’s square footage, how much is wrong once the walls open, whether you relocate plumbing or electrical, the grade of materials, and the permit scope.
Here’s roughly how the money breaks down on a mid-range Tustin remodel:
| Item | Typical range |
|---|---|
| Cabinets | $4,000 – $13,000 |
| Countertops | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island (if added) | $3,000 – $10,000 |
A written estimate should state exactly what’s covered: permits, demo, haul-off, materials by brand and model, labor, and the inspection schedule. What we don’t include by default are things nobody can see until demo day – hidden water damage, rotten subfloor, or a wiring upgrade the city requires. We’ll put those in writing the day we find them, with upfront pricing, so the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Tustin homes specifically do to this job
Tustin’s housing stock throws two different problems at a kitchen remodel, depending on which side of town you’re on. In Old Town, the 1920s Craftsman and Spanish Revival bungalows are beautiful and complicated: knob-and-tube wiring, original plumbing, and foundations that need attention before you tile a floor. We open the walls expecting surprises and plan the schedule around them. On the Tustin Legacy side, on the former Marine Corps Air Station footprint, the homes are new builds, so the kitchen work is more about layout and finish than repair – but the site work and soil handling still differ from old ground. Any contractor working there also deals with the historic blimp hangars and preservation considerations in the surrounding district, which shapes what inspections look like.
Tustin’s dry Mediterranean summers and Santa Ana wind events make sun exposure and materials choice matter for any west-facing window or tile selection. Winter rain can expose grading and roof issues while the kitchen is torn apart, so we plan demo phases around the weather forecast instead of fighting it. Permits run through the city, and inspections happen in sequence – rough, then final – which is one reason the timeline is weeks, not days.
Serving Tustin, CA – Our Local Coverage Area
We serve Tustin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: full kitchen remodeling in Tustin

A full kitchen remodeling in Tustin typically takes 6 to 10 weeks from demo to final walkthrough. Permits add a few days at the front, and countertop fabrication adds about two weeks mid-project. Call (833) 954-6066 for a schedule built around your actual selections.
Yes, if you’re moving plumbing, electrical, gas lines, or a wall, you need a permit. Cosmetic swaps like cabinet doors and paint usually don’t require one. We pull the permits and manage the inspections for you, and the completed inspections become part of your project record.
Yes, and staying put saves real money. Keeping the sink and range in place drops the plumbing and gas line changes to near zero and keeps the timeline shorter. Moving a wall or window is where a full kitchen remodeling budget jumps.
Only if we find something hidden, and we put it in writing before we touch it. Our upfront pricing means the line items in the estimate are what you pay. If the walls reveal a surprise, you approve the change in writing first. That’s how the 730-Day Done Right Promise works in practice.
Every full kitchen remodeling project we do is covered by the 730-Day Done Right Promise. If the workmanship isn’t right, we make it right, for two years from completion. That’s one of the longest workmanship guarantees in residential construction.
Ready to price your Tustin kitchen?
Call (833) 954-6066 for a free on-site estimate on full kitchen remodeling in Tustin. We’ll walk the room, talk through layout and materials, and leave you with a written line-item estimate and a realistic schedule. Our technicians have up to 12 years of experience, calls are answered by a live person around the clock, and $1,000 off projects over $10,000 is available right now, along with 0% financing for 18 months. If your project is part of a whole-house plan, you can see the wider scope on our Kitchen Remodeling in Tustin page – and homeowners often pair this with Full Bathroom Remodeling in Tustin or Walk-In Showers & Shower Remodeling in Tustin.
If you’re still mapping out the whole house, take a look at our Kitchen Remodeling service and the broader coverage we offer across Tustin. Call (833) 954-6066 to get started.
Written by the team at Groundwork Construction Co. of Tustin.












