Full Kitchen Remodeling in Irvine, CA: Scope, Timeline, and Real Cost
Full kitchen remodeling in Irvine, CA runs $14,000 – $45,000 and generally takes six to ten weeks from first demo to final inspection, depending on whether walls move and how deep the cabinet and countertop package goes. That number covers a complete tear-out of cabinets, counters, flooring, backsplash, and appliances, plus new lighting and a permit through the City of Irvine. Call (833) 954-6066 to walk through your kitchen and get a written line-item estimate.
What Full Kitchen Remodeling actually involves, stage by stage

A full kitchen pull isn’t a facelift with new doors. It’s a sequenced construction project, and the order matters more than the finish selections. Here’s how we run it in Irvine homes, with the durations you should expect on the calendar.
Stage 1: Design and permit (weeks 1 – 3)
We measure the room, document existing plumbing and electrical runs, and lock the layout before anyone swings a hammer. You decide here on appliance sizes and locations, sink placement, whether a wall opens up, and the cabinet and countertop package. This is also when the plan goes to the City of Irvine for permit, and when your HOA’s architectural committee hears about any exterior change that touches the kitchen window or slider. Permitting alone typically eats two to three weeks. Changing your mind after this stage is where remodels get expensive, so we push hard on decisions now.
Stage 2: Demo and protection (days 1 – 3)
Day one is dust walls up, floors covered, appliances disconnected, and haul-away. By day two the cabinets, counters, and old flooring are out, and by day three the room is down to studs and subfloor. You’ll hear how the bones look: what’s wet behind the sink, whether the subfloor is sound, where old wiring falls short of current code. That inspection is when change orders most often surface, and we price them before we touch them.
Stage 3: Rough-in (days 3 – 10)
Plumbing, electrical, and HVAC get moved or added here, then the rough-in inspection happens before drywall closes the walls. If you’re relocating the sink under a window or adding a hood vent through the exterior wall, this is the week it happens. Skipping the rough inspection to save a day is how homeowners end up with a beautiful kitchen that fails final. We don’t do that.
Stage 4: Assembly (weeks 3 – 7)
Insulation and drywall first, then paint, then cabinets and the countertop template. Fabrication of stone or quartz takes roughly five to ten business days between template and install, so that gap is built into the schedule, not an accident. Flooring, backsplash, appliances, and trim follow. Expect this to be the longest stretch and the one where you’re living out of a temporary kitchen setup.
Stage 5: Punch and close (final week)
Final inspection, appliance calibration, hardware adjustments, and a walkthrough where you build the punch list with us. We don’t call a kitchen done until the list is cleared. Every project we complete carries the 730-Day Done Right Promise, which means if something isn’t right, we come back and make it right for two full years.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that decide your kitchen: what to weigh, not just what to pick
The finish package drives the price range more than square footage does. Here’s the honest trade-off on the decisions you’ll actually make.
- Cabinet construction. Stock boxes keep the budget lean but limit sizing. Semi-custom runs a step up and fits odd dimensions without filler strips. Full-custom eats 20 – 30% more of the budget and suits unusual layouts. KraftMaid sits well in the semi-custom tier and holds up to daily family use.
- Countertop material. Quartz is the practical default in Irvine kitchens: non-porous, no sealing, and forgiving of the hard water here. Cambria’s quartz lines hold a clean edge. Granite costs less per square foot on entry grades but needs periodic sealing. Butcher block and laminate save money and lose durability.
- Flooring. Porcelain tile handles wet traffic and doesn’t care about the dry Irvine summers. Luxury vinyl plank is the budget win and looks convincing. Engineered hardwood adds warmth, and it’s the option most likely to show water damage near the sink.
- Lighting and electrical. Under-cabinet LED, recessed cans on dimmers, and dedicated appliance circuits are worth the spend and hard to add later without opening walls again. Skip this and you’ll notice it every evening.
- Windows and sliders. If the kitchen window or patio slider is original 1980s glass, replacing it during the remodel costs less than doing it separately. Therma-Tru doors and ES Windows sliders are common picks for Irvine kitchens that open to a patio.
What Full Kitchen Remodeling costs in Irvine, CA

Most full kitchen remodels in Irvine land between $14,000 and $45,000. Where you fall in that band comes down to five things, and they’re not mysterious.
| Cost factor | What pushes toward the low end | What pushes toward the high end |
|---|---|---|
| Room size | Galley, under 100 sq ft | Open plan, 200+ sq ft with island |
| Layout change | Keep sink, range, and fridge in place | Move plumbing, add a range hood vent, open a wall |
| Cabinet package | Stock or semi-custom, painted finish | Full-custom, inset doors, specialty storage |
| Countertop | Entry quartz or granite | Book-matched stone or a large island slab |
| Permit scope | Cosmetic, no structural change | Wall removal, new electrical panel work, window replacement |
A written estimate from us itemizes cabinets, countertop square footage, labor, permit fees, and haul-away line by line. What it typically doesn’t include: appliance purchase (we’ll spec and coordinate, you buy), HOA architectural review fees, and any structural repair discovered after demo. We tell you that up front instead of surprising you in week two. Upfront pricing means the number in the estimate is the number you pay, and 0% financing for 18 months plus $1,000 off projects over $10,000 keeps the entry point reachable.
See the difference
Before
After
Before
After
Before
AfterHow Irvine’s housing stock and HOA rules change this job
Irvine is a master-planned city, built largely by the Irvine Company starting in the 1970s, which means nearly every kitchen we remodel sits inside an HOA-governed village. That has real consequences. In Woodbridge and Northwood, the 1970s and early-1980s tract homes still have original single-pane windows, older wiring, and plumbing at the end of its service life, so a “cosmetic” remodel often turns into a repipe decision once the drywall is open. In the newer Great Park and infill builds, kitchens are in denser attached homes where party-wall detailing and fire separation limit what you can drill or cut, and where layouts are tighter. Before a permit is issued, an exterior window or slider change usually needs HOA architectural committee approval, and the wrong window profile or stucco shade can stop a job cold. We build that review into the schedule from the start, not as an afterthought. This is legitimately a full kitchen project, so it makes sense to read our Kitchen Remodeling in Irvine page for the wider scope, and if the powder room is dated too, homeowners often pair this with Full Bathroom Remodeling in Irvine while the crew is already on site. We cover all of Irvine, including the 92606, 92614, 92623, and 92710 ZIP codes.
Serving Irvine, CA – Our Local Coverage Area
We serve Irvine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked questions about Full Kitchen Remodeling in Irvine

Plan on six to ten weeks from demo to final walkthrough. Permitting typically adds two to three weeks before work starts, and pulling a wall or relocating plumbing pushes the whole schedule to the longer end. Call (833) 954-6066 for a timeline built around your specific kitchen.
Yes, any full remodel that touches plumbing, electrical, or structural elements requires a City of Irvine permit and inspections. We pull the permit and meet the inspector ourselves, so you’re not chasing paperwork. Cosmetic-only work like cabinet refacing may not need one, but that’s a smaller job than a full remodel.
Yes, and it’s the single biggest cost saver. Keeping the sink, range, and refrigerator in their current locations avoids both plumbing relocation and structural work, which can keep your project near the $14,000 – $25,000 range instead of the top of the $45,000 band. Call (833) 954-6066 and we’ll tell you honestly what your layout allows.
The realistic range is $14,000 to $45,000 for a complete remodel. Size, layout changes, cabinet and countertop grade, and permit scope are what move the number, and a written estimate from us breaks every line out. Estimates are free, so call (833) 954-6066 for an exact quote on your kitchen.
Every full kitchen remodel we complete is covered by the 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If anything we installed isn’t right, we make it right, with no fine print about what’s excluded.
Get a free estimate on your Irvine kitchen
We’ll come to your kitchen, measure it, talk through the layout options, and hand you a written line-item estimate with no obligation. Calls are answered by a live person, 24/7, so you reach a real human whenever you pick up the phone. If your bathroom is next in line, we handle Walk-In Showers & Shower Remodeling in Irvine as well. Call (833) 954-6066 to schedule your free on-site estimate and see what Kitchen Remodeling for your full remodel actually costs.