







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Anaheim: What the Job Actually Costs and How Long It Takes
Cabinet and countertop replacement in Anaheim typically runs $14,000 – $45,000 for a full kitchen’s worth of cabinetry and slab, and a straight swap in the same footprint usually takes two to three weeks from demo to final caulk. Cabinet installation alone lands at $4,000 – $13,000; countertop installation at $2,000 – $6,500. If you want your actual number instead of a range, call (833) 954-6066 and we’ll walk the kitchen with you.
Most Anaheim calls we get are not “design my dream kitchen.” They’re a 1958 ranch in the 92805 flats with sagging particleboard boxes and a tile counter that’s been grouted three times, or an Anaheim Hills kitchen where the cabinet layout wastes half the room. Two very different jobs, two very different numbers.
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Full cabinet and countertop package: $14,000 – $45,000
How We Run a Cabinet and Countertop Job in Anaheim, Start to Finish

Cabinet and countertop work is a sequence problem before it’s a design problem. Get the order wrong and your slab arrives before the boxes are set. Here’s the actual cadence.
Stage 1: On-site measure and layout (day 1, about 90 minutes)
We measure every wall for out-of-square, because postwar Anaheim tract homes are rarely plumb. This is where you decide box vs. frame construction, door style, and whether the sink stays put. Anything you change here costs a fraction of changing it in week two.
Stage 2: Demo and rough prep (days 2 – 3)
Old cabinets, counter, and backsplash come out. We check the wall behind for water damage, old tile adhesive, and any wiring run that has to be moved for a new box depth. If the wall is soft or the floor is out of level by more than a quarter inch across the run, that gets corrected now.
Stage 3: Cabinet setting and leveling (days 4 – 6)
Base and wall boxes get set, shimmed, and scribed to the wall. This is the stage people underestimate. A 12-foot run in a 1962 house can need a half inch of shimming at one end. Crown, filler, and scribe molding hide the sins; a bad set makes every door reveal look wrong forever.
Stage 4: Template and fabrication (days 7 – 12, mostly waiting)
Once the boxes are locked, the countertop gets templated. Stone shops in Orange County typically need seven to ten business days for fabrication. This is the dead time in the schedule, and it’s why a “two-week kitchen” quietly becomes three. Nobody’s fault, it’s just the sequence.
Stage 5: Counter install, sink, and punch list (days 13 – 15)
Slab goes down, sink and faucet get set, seams get epoxy and polish. You walk the job with us before we call it done. Our 730-Day Done Right Promise covers the workmanship from that walkthrough forward.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You
- Stock vs. semi-custom cabinets: Stock boxes are cheap and fast, but they come in fixed widths, which means fillers everywhere in an odd-sized Anaheim kitchen. Semi-custom lets you hit the wall exactly. It’s the difference between a job that looks built-in and one that looks assembled.
- Particleboard vs. plywood boxes: Plywood costs more and holds screws and moisture far better. In a kitchen with a dishwasher and a sink, that matters. Particleboard boxes are the reason so many of these Anaheim remodels start in the first place.
- Quartz vs. granite vs. laminate: Quartz is the default now. Non-porous, no sealing, consistent pattern. Granite is a natural slab, so no two are alike, and it needs periodic sealing. Laminate costs a fraction and has come a long way, but it still burns and chips at the edge.
- Slab thickness and edge profile: A 3cm slab with a simple eased edge keeps cost down. A mitered edge that makes the counter look 4cm thick adds labor and money.
- Drawers vs. doors: All-drawer base cabinets cost more but are the single biggest usability upgrade most homeowners make. You decide this at layout, not later.
What Cabinets & Countertops Cost in Anaheim, CA

Plan on $14,000 – $45,000 for a full package. The low end is a same-footprint swap with stock cabinets and laminate or entry-level quartz. The high end is semi-custom or full-custom cabinetry, a premium slab, a relocated sink, and a panel upgrade. Four things move the number:
- Kitchen size and run length: a linear foot of base cabinet runs roughly $150 – $500 installed depending on grade. A 12-foot galley and a 25-foot L-shape are not the same job.
- Condition of what’s behind the cabinets: soft drywall, out-of-level floors, or old tile adhesive add prep days.
- Moving the sink, range, or a wall: relocating plumbing or a gas line is where budgets break. Keep the sink where it is and you save real money.
- Material grade: the jump from laminate to quartz is a few thousand. The jump from stock to custom cabinetry can be fifteen.
A written estimate from us is line-item: cabinets, counter, demo, haul-away, any electrical or plumbing allowance, permit fees if a permit is required. What it won’t include is a surprise change order, because our pricing is upfront and the number you see is the number you pay. Call (833) 954-6066 for an exact quote.
See the difference
Before
After
Before
After
Before
AfterWhat Anaheim Homes Specifically Do to This Job
The kitchen we open up most often in Anaheim is a 1950s or 60s ranch in the central and western ZIPs, and those houses hand you two things: walls that are out of square and a kitchen built around a 30-inch range that nobody makes anymore. The citrus-era bungalows are worse, with cabinet runs that were framed in place rather than hung. In the Anaheim Hills ZIPs, 92807 and 92808, the kitchens are newer and the boxes are usually fine. What’s off is the layout, and because those are hillside homes with view lots, moving a wall means confirming you’re not touching a structural span.
Permits are the other Anaheim-specific piece. A like-for-like cabinet and counter swap doesn’t require one. Move a wall, add an island with a sink, or relocate a gas line and you’re into plan review and inspection, which adds weeks and a fee. Kitchen remodeling is one part of the wider scope we handle, and if your job grows past cabinets, our kitchen remodeling service covers the rest. We work across Anaheim and the surrounding neighborhoods.
Serving Anaheim, CA – Our Local Coverage Area
We serve Anaheim and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Anaheim

Two to three weeks for a same-footprint swap, and four to six if the countertop is stone and you’re waiting on fabrication. The dead time is the slab, not the labor.
No, if you’re keeping the same footprint and not touching plumbing, gas, or structure. Relocate a sink, add an island with a drain, or move a wall and you do need one. We tell you upfront which category your job falls into.
Yes, and we’d usually recommend it. Keeping the sink and range where they sit saves the plumbing and gas work and keeps you out of permit territory. Moving a sink is a decision to make at layout, not mid-job.
$14,000 – $45,000 depending on size, material grade, and whether anything moves. Cabinet-only installation runs $4,000 – $13,000 and countertop-only runs $2,000 – $6,500. Call (833) 954-6066 for a line-item quote.
Our 730-Day Done Right Promise covers the installation workmanship for two full years. If something we set shifts or a seam opens, we come back and make it right.
Homeowners often pair this with Walk-In Showers & Shower Remodeling in Anaheim when they’re updating the main floor, or a Tub-to-Shower Conversion in Anaheim if the hall bath is next. If the whole thing snowballs, Kitchen Remodeling in Anaheim covers the full scope.
Get a Free Cabinet and Countertop Estimate in Anaheim
Call (833) 954-6066 and a live person picks up, any hour. We’ll set a time to measure your kitchen, talk through materials and layout on site, and hand you a written line-item estimate. No pressure, no vague “it depends” number. Our technicians have up to 12 years of experience, they’re background-checked, and they show up in uniform.
Written by the team at Groundwork Construction Co.












