A Groundwork company - serving Tustin, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Aliso Viejo, CA

ADU Site Prep & Utilities in Aliso Viejo - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Tustin
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Aliso Viejo, CA: What It Actually Takes

ADU site prep and utilities in Aliso Viejo runs $45,000 – $130,000 and usually takes 4 – 8 weeks before the first wall goes up, covering grading, trenching, the utility runs, and the slab. That price is for the under-the-dirt work plus the foundation, not the finished unit. On a post-tension slab lot in 92656, the first two weeks are often about locating cables and routing around HOA-mandated screening before any concrete is poured. Call (833) 954-6066 and we’ll walk your lot and give you a real number.

Call (833) 954-6066

How the site prep and utility work actually runs

A remodeled family room with new windows and a window seat

This is the part of the build most homeowners never see, and it’s the part that decides whether the rest goes smoothly. Here’s the sequence we follow on Aliso Viejo ADU projects, stage by stage.

Stage 1: Site walk, utility locate, and survey (week 1)

We mark the proposed footprint, pull the plot plan, and call in the 811 locate. On a property with a post-tension slab, we also bring in a cable scanner to map the tensioned strands before anything is cut. You decide the ADU’s final position relative to the property line and your existing patio or driveway, because that choice locks in every trench path downstream.

Stage 2: Demolition, grading, and erosion control (weeks 1 – 2)

We tear out whatever’s in the way (old concrete patio, planters, failing fence runs), grade to the finished floor elevation, and install silt fencing so winter rain doesn’t send your clay soil into the neighbor’s yard. You sign off on the final pad height, which sets how the unit sits against the slope. On a lot with expansive clay this grading and compaction step is where most of the money either gets saved or lost.

Stage 3: Utility trenching and rough-in (weeks 2 – 4)

Water, sewer, gas, electrical conduit, and low-voltage all go in the ground now, in one coordinated trench where the runs allow it. We tie into the main sewer lateral or install a pump system if the ADU sits below the main line. You choose the electrical panel location and whether the ADU gets a subpanel or a dedicated meter, which changes the trench count and cost.

Stage 4: Foundation and slab (weeks 4 – 6)

Forms, rebar or post-tension cabling, termite treatment, and pour. For an Aliso Viejo build we spec foundation detailing with the expansive clay and seasonal movement in mind, and we keep the tensioned cables clear of any plumbing penetration. You confirm the rough-in placements one more time before the pour because after that, moving a drain means cutting concrete.

Stage 5: Inspections and handoff to vertical construction (weeks 6 – 8)

We coordinate the underground utility and foundation inspections, pull the sign-offs, and hand the site to the framing crew. You get a clean, inspected pad and a documented utility map for future landscape work. That’s when the ADU shell can start.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll make during site prep

Most of the decisions on this job are about how the ADU connects to the world, not how it looks inside. These are the ones that come up on almost every Aliso Viejo lot.

  • Sewer tie-in vs. grinder pump: Tie into the existing lateral if the ADU sits at or above the main; a pump is cheaper to dig but adds maintenance. On sloping Aliso Viejo lots the gravity option is usually the right call.
  • Subpanel vs. dedicated meter: A subpanel is the lower-cost path and simpler to permit; a separate meter lets a tenant pay their own power. Decide early because it changes the trench and conduit count.
  • Utility trench sharing: One coordinated trench for water, gas, and electrical costs less in labor and concrete patching than separate runs, but upsizing conduit now pays off if you’ll add landscape lighting later.
  • Erosion control and drainage: A French drain or swale along the uphill side protects both the slab and your existing foundation. Skip it and the wet-season soil movement in clay gets expensive.
  • HOA screening: A fence or landscape screen per the CC&Rs often dictates where the ADU can sit, which then changes every trench path. We factor this in before grading, not after.

Framing materials matter less here than the slab and foundation system, which we spec to the soil and drainage at your specific lot. If you want windows and impact-rated glazing on the unit later, we can rough the openings ahead of time.

What ADU Site Prep & Utilities costs in Aliso Viejo

A framer checking new wall framing on a home addition

For Aliso Viejo, site prep and utilities for an ADU typically lands in the $45,000 – $130,000 range, and that’s before the finished structure. The number moves most on five things: how far the ADU sits from the main utility connections, whether the lot needs grading or retaining, whether the sewer can gravity-feed, the electrical service and panel scope, and the foundation system required for the soil and slope.

  • Utility distance: long runs from the street or main lateral push a job toward the top of the range.
  • Site condition: heavy grading, retaining walls, or compacting expansive clay costs more than a flat, easy lot.
  • Sewer strategy: a gravity tie-in is cheaper than a grinder pump system and the electrical to run it.
  • Electrical scope: a subpanel adds less than a dedicated meter and service upgrade.
  • Foundation: slab-on-grade with the right detailing costs less than a stepped or engineered foundation on a sloped lot.

A written estimate we prepare will spell out trenching, utility materials, the foundation spec, inspections, and disposal line by line. It won’t quietly include the finished ADU structure, the interior finishes, or HOA submittal fees, since those are separate. You get upfront pricing with no change orders unless the scope changes.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Aliso Viejo homes do to this job

Aliso Viejo was built almost entirely after 1980, so this is not old-house retrofit work. It’s 1980s – 2000s Mediterranean and Spanish-style stucco homes and attached townhomes, often on tile roofs and post-tension slab foundations. That slab is the part that catches out-of-area contractors: any penetration or trench that crosses it needs the tensioned cables located and avoided first, and a cable strike is a very expensive lesson. The city’s strict HOA and architectural review process means the ADU footprint, screening, and utility routing all get reviewed against the CC&Rs before we touch the ground, so we build the submittal into the schedule rather than treating it as a surprise. The semi-arid climate, hot dry summers followed by mild wet winters, works the expansive clay under these lots, which is why we specify drainage and compaction carefully rather than assuming a flat-pad job.

This prep work is one piece of a larger project. If the ADU is part of a full Home Additions & ADU in Aliso Viejo build, our Home Additions & ADU hub lays out the whole scope. Homeowners often pair this with Small & Partial Kitchen Remodels in Aliso Viejo in the main house once the ADU is underway, and Full Bathroom Remodeling in Aliso Viejo on the primary bath. We cover Aliso Viejo and the surrounding neighborhoods in 92656 and 92698.

Serving Aliso Viejo, CA – Our Local Coverage Area

We serve Aliso Viejo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Aliso Viejo

An open kitchen and dining area after a remodel

Schedule your free on-site estimate

Book a free on-site estimate for ADU site prep and utilities in Aliso Viejo. We’ll walk the lot, check the slab and drainage, and hand you a written line-item number for the utility runs, grading, and foundation. Calls are answered by a live person 24/7, so no voicemail and no waiting until Monday. Call (833) 954-6066.

Written by the team at Groundwork Construction Co.

Why Aliso Viejo Chooses Groundwork Construction Co. of Tustin

We set the standard for ADU site prep & utilities in Aliso Viejo.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Aliso Viejo

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Aliso Viejo Customers Say

Trusted by homeowners across Aliso Viejo and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Aliso Viejo

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Tustin

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Tustin team

A local vetted partner works across Tustin and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Aliso Viejo?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Aliso Viejo.

(833) 954-6066

Request a Free Estimate in Aliso Viejo

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch